Teledyne-lecroy Protocol PCI Express Script Automation Test Tool Bedienungsanleitung Seite 35

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 55
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 34
Teledyne LeCroy PCI Express Script Automation Test Tool User Manual
31
3.1.2.4 Tests Requiring DUT Actions
The following three tests require some DUT actions to check all assertions. When the test is executed, the
PCI Express Script Automation Test Tool instructs the PETrainer™ to wait for the specific DUT action at the
proper point with the timeout of four seconds.
If the DUT does not send the expected TLP, the test proceeds to the next stage. When verification is executed, it
checks for the presence of the DUT actions at the proper stages.
If the DUT did not send the TLPs expected, the corresponding assertions are not checked, and the notification is
given in the log.
If no assertions could be checked for a test run, it is declared DONE rather then PASSED or FAILED.
Seitenansicht 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 54 55

Kommentare zu diesen Handbüchern

Keine Kommentare